Donate Advertising Contact

San Benito River Bridge Work 05/29/18A 09:20 S.S.

An  emergency  project,  to  remove  and  replace  new  Bridge  Joint  Seals  on  the  San  Benito  River  Bridge  on  Southbound  Highway  101,   is  slated  to  begin  tonight.     Alternating  lane  closures  can  be  expected  between  9  p.m.  and  7  a.m.  through  Friday.      Cal-Trans  plans  to  set  up  Detour  Signs,  and  Electronic  Message  Boards,  to  assist area  motorists.

Leave a Reply

Your email address will not be published. Required fields are marked *